International: englishInternational: english
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italianodeutsch
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Norge: norsk
Norge: norskNorge: norsk
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutschfrançais
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
USA: english
USA: englishUSA: english

Finance tower Intesa Sanpaolo

Turin, Italy

With 39 floors the 218-meter-high Intesa Sanpaolo tower in Turin is the headquarters of the largest Italian credit institution.

The building of 218 meter high office and administration building of Intesa Sanpaolo has been underway in the centre of Turin since March 2009. The headquarters of the largest Italian credit institution is a 39 floor finance tower. In addition to offices for 3,000 employees, architect Renzo Piano has also planned roof gardens and technology solutions that reduce energy consumption by one third.

The building contains 800 tons of Coupler screw connections from MAX FRANK. The challenging requirements for force transfer in the working joints were fulfilled with the combination of Coupler, Stabox® and Stremaform® products. Due to the variation of different joint formwork elements, the elements can be manufactured in both the transverse and shear directions as indented joint design. The joint elements are made in-house and delivered to the building site prefabricated and ready to assemble.

Type of building:

High-rise building

Clients and Developers:

Intesa Sanpaolo S.p.A.

Architect:

Renzo Piano

Building contractor:

Geom. Orlando

Completion:

2014

Products used
Contact Contact
Contact

+49(0) 9427 189-0

Max Frank GmbH & Co. KG
Mitterweg 1
94339 Leiblfing
Germany

blub