International: englishInternational: english
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italianodeutsch
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Norge: norsk
Norge: norskNorge: norsk
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutschfrançais
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
USA: english
USA: englishUSA: english

Mine water cleaning plant

Profen, Germany

The mine water cleaning plant was the realisation of an environmental protection project for clean water. MAX FRANK supplied sealing technology products.

A modern treatment plant is being built on an area of around 1.2 hectares at the Profen open pit. The total capacity of the four treatment lines is approx. 10,000 cubic meters of water. The plant measures 85 by 85 meters and with the company building is around eleven meters high. Up to 120 cubic meters of water per minute can be treated at Profen. The result is clear, clean water.

After treatment, the water is passed through a ditch system into the White Elster. Part of the water will be used to stabilize the water supply and to flood and re-cultivate the Schwerzauer See.
A redundant joint seal according to the multi-barrier principle for concrete working joints was favoured for the project. This was to involve the design of several independent systems. All MAX FRANK sealing technology products are fully inter-compatible. The specialist planner decided to use the Fradiflex® polymer-coated metal water stop as the primary sealing and finished the seal with a Cresco® expanding waterstop.

Type of building:

Treatment plant

Clients and Developers:

MIBRAG mbH, Zeitz

Building contractor:

Hochtief Infrastructure GmbH, Berlin

Completion:

2017

Products used
Contact Contact
Contact

+49(0) 9427 189-0

Max Frank GmbH & Co. KG
Mitterweg 1
94339 Leiblfing
Germany

blub